ADVANCED PLANNING ANALYTICS
  • Home
  • About Us
    • Contact Us
    • Deltek Acumen Users Group
  • Training
    • Deltek Acumen Fuse & Risk
    • Primavera P6
    • P6 Advanced EVM
    • Acumen & P6 Risk
    • ONLINE P6
    • EVM in P6 Online Course
  • CONSULTING
    • SERVICES & CONSULTING
    • PROJECT STAFFING
    • CAREERS
  • APA Store
  • APA Store
  • >
  • XER P6 Templates
  • >
  • Offshore Deep Water Typical Level 4 Schedule Template [661 activities]

Offshore Deep Water Typical Level 4 Schedule Template [661 activities]

SKU: APA.2100
$661.00
$661.00
$661.00
Unavailable
per item

By a large demand, I have decided to sell my XER templates for public use. Over all of my career, I have fine tuned and developed optimal Level 3 Schedule Templates. This logic has been vetted continuously by APA and is used as the primary starting template for all of our schedule development. APA has over 21 years building, evaluating, and developing schedules regarding EPC Logic. This file is considered a Level 4 schedule ready with settings for utilizing Earned Value in Primavera P6.


Your purchased XER native file package contains:


All activities that flow from Engineering to Construction Summaries & Commissioning


Summaries

·       Engineering

·       Procurement

·       Subcontracts

·       Fabrication

·       Construction

·       Commissioning


Fully detailed engineering logic that flows through deliverables and interdisciplinary logic that are linked to the Model Review. Disciplines include but not limited to:

·      Geotechnical & Geo Hazard

·       Risk Management, VIP  

·       Design Safety    

·       Reliability Assurance & Integrity Management    

·       Project Manager/Engineering Manager  

·       Project Control Manager             

·       Project Administration   

·       Health, Safety, Security, and Environment            

·       Document Control          

·       Cost Control & Accounting          

·       Planning & Scheduling   

·       Quality Assurance           

·       Project Manager             

·       Design & Drafting           

·       Flowline Engineering      

·       Risers   

·       Production & Gas Export SCR Taper Stress Joints

·       SPAR Onsite Pull Tube & I-Tube Drift / survey      

·       Subsea Controls

·       Subsea Umbilical             

·       Flow Assurance 

·       Corrosion, ECA and Materials     

·       Interface Coordination  

·       SCR Pull Tube



Also included with XER purchase is the following P6 Layouts:

·       Activity Type Check / Count

·       Duration Type Check / Count

·       Constrained Activity Review

·       % Complete Type Check / Count

·       Calendar Check / Count

·       Longest Path

·       Multiple Float Path

·       4 Week Update

·       90 Day Look Ahead

·       S-Curve

·       EVM – EAC Analysis

·       WBS Working Layout [used to update EVM]

·       No Actual Finish & % Complete =100

·       Actual Start & no % Complete started

·       Actual Finish & % Complete <100

·       Expected Finish > Data Date


NOTE: Be sure to use the group and sort by Activity Code and NOT WBS. WBS is the most misused method in P6. I'm an old school scheduler and used Activity Codes to represent the WBS.


Disclaimer: Template is intended to provide a majority start of most schedules. This is not a copy/paste for your projects. It is the responsibility of the planner/scheduler/project team to customize their schedule based on their scope of work and reviewed/approved by the project team.

Add to Cart
Picture
Privacy Policy

Terms of Use

Excel Gantt Tool
Copyright © 2019 - Advanced Planning Analytics,  All Rights Reserved
  • Home
  • About Us
    • Contact Us
    • Deltek Acumen Users Group
  • Training
    • Deltek Acumen Fuse & Risk
    • Primavera P6
    • P6 Advanced EVM
    • Acumen & P6 Risk
    • ONLINE P6
    • EVM in P6 Online Course
  • CONSULTING
    • SERVICES & CONSULTING
    • PROJECT STAFFING
    • CAREERS
  • APA Store